Current Projects
| YA-SA İŞ MERKEZİ ÇAMLICA / İSTANBUL |
| Client |
: |
YA-SA DENİZCİLİK |
| Scope of Work |
: |
Installing heating system-cooling system-air condition (HVAC), fire detection and extinguishing system, building automation system and plumbing |
| Contract Date | : |
August 2009 |
| Total Construction Area |
: |
8.000 M2 |
| Substations |
: |
Cooling Substation : 567 kw
Heating Substation : 400 kw
1 Chiller
4 Tanks
8 Air Handling Unit |
|
SWISSOTEL THE BOSPHORUS, ISTANBUL
RESIDENCE RENOVATION PROJECT MECHANICAL WORKS
|
| Main Firm |
: |
FIBA GROUP
ANADOLU JAPAN TURIZM A.S.
|
| Main Contractor |
: |
MOB A.S. |
| Scope of Work | : |
1. Air condition stations
2. The units of fans,ventilation and exhaust
3. Fabrikasyon kanallar ve fittingleri
4. Fire dampers
5. External air entrances
6. Air dispatch equipments, fittings and terminal units
7. Vibration isolators
8. Valves and list of valves
9. Insulation, inlay and leakproofings supplies
10. Sound and vibration control equipments
11. Manometers
12. Thermometers
13. Assembly plates (mirrors)
14. Automatic control system equipments
15. Filters
16. Channel construction details
17. Floor and roof drains
18. Pumps
19. Tanks
20. Antigorites
21. Noise isolators
22. Computer room air conditioning equipments
23. Humidifiers
24. Heat exchangers
25. Kullanma Sıcak su üreticileri
26. Water preparation units
27. Pipe and pipe fittings
28. Flexible joints
29. Havalıklar
30. Expansion parts and compensators
31. Plumbing fixtures and armatures
32. Sprinkler system equipiments
33. Fire extinguishing equipments
|
|
|